Time: On December 30, 2025.
Location: Yemen.
Event: On December 30, 2025. CORINMAC's 5TPH(ton per hour) dry mortar production line was successfully loaded and delivered to Yemen.
The whole set of 5TPH dry mortar production line equipment including screw conveyor, ton bag un-loader, weighing hopper, manual feeder for chemical additives, single shaft paddle mixer, steel structure, finished product hopper, pulse bag dust collector, impeller packing machine for valve bag, vibrating screen, PLC control cabinet, air compressor and spare parts, etc.
To ensure the safety of cross-border transportation, the technical team paid attention to every detail: core components were packaged with custom moisture-proof and rust-proof packaging, high-strength reinforcement solutions were used for container loading, and multilingual operation manuals and remote after-sales support were provided to ensure that the equipment could be put into production quickly upon arrival.
Container loading photos are as follows:
Post time: Dec-31-2025


